Senior Thesis Presentation: The Westlake Recreation Center Summer Padgett Faculty Advisor: Dr. Mistrick Electrical / Lighting Option April 13th, 2004
2
Building Information This facility serves as a park and recreation center for the citizens of Westlake Total Building Area: 82,710 ft 2 Total cost of the construction: $15.3 million dollars Features four swimming pools, a gymnasium, locker rooms, a fitness room, a multi-purpose room, a babysitting room, a community room and recreation department offices
3
Discussion Topics LIGHTING Lighting redesign one indoor space and one outdoor space ELECTRICAL / CM Cost analysis of a power factor correction
4
LIGHTING – Exterior Photographs: Front Façade of Building and Drive-around Inside of Front Porch Exterior Façade Front Porch
5
LIGHTING – Exterior Location of Lighting Redesign
6
LIGHTING – Exterior IES CRITERIA: Facial Modeling, peripheral detection, and shadows are issues that must be addressed in this area. The building is open until 10:00 p.m. at night, so security is a concern. A horizontal illuminance of 5 footcandles and a vertical illuminance of 3 footcandles is required near the entrance. Since I am dealing with the exterior, light pollution is always an issue.
7
LIGHTING – Exterior DESIGN GOALS: Metaphorically, I want the front porch to act as a beacon, or guiding light to the entrance of the Recreation Center Distinct separation between the road and the sidewalk Wanted to create a streetscape theme to define pathways and draw attention to the front façade to highlight the architecture
8
LIGHTING – Exterior EQUIPMENT USED: Davit Mounted 16’ Pole Fixtures Lining the Drive-Around Bollards Lining the walkways Two metal halide pendant-mounted fixtures in the porch Inground wallwashing fixtures to accent the façade
9
LIGHTING – Exterior EQUIPMENT LOCATIONS: Davit Mounted Pole Fixture: 1-175 W MH lamp Mounted at 16’
10
LIGHTING – Exterior EQUIPMENT LOCATIONS: Bollard: 1-100W MH lamp
11
LIGHTING – Exterior EQUIPMENT LOCATIONS: Inground Fixture: 1-70W MH lamp
12
LIGHTING – Exterior EQUIPMENT LOCATIONS: Pendant Fixture: 1-100W MH lamp
13
LIGHTING – Exterior ILLUMINANCE RESULTS: SIDEWALK PORCH DRIVEWAY
14
LIGHTING – Exterior RENDERING S:
15
LIGHTING – Exterior CONCLUSIONS: The power density for an entrance with a canopy is 3W/ ft 2, so 0.4 W/ ft 2 is significantly under this requirement. The allowable power density for façade area is 0.25 W/ ft 2, so the power density for my façade just meets this. The average porch illuminance is 8.83 fc, which is more than the required 5 footcandles. Pole fixtures provide distinction between the road and the sidewalk. Pendants in porch area give the area a glow without adding light pollution.
16
LIGHTING – Community Room Photograph: Community Room Interior Community Room Interior: Ceiling Height = 13’3” 4 large square coves Ceiling r =80% Carpet r =30% Wall r =50%
17
LIGHTING – Community Room Room Layout
18
LIGHTING – Community Room Location of Lighting Redesign
19
LIGHTING – Community Room IES CRITERIA: Very Important: Appearance of the space and color appearance/contrast are issues here because this is an elegant area. Color correlated temperatures should be kept around 3000K. Important: Modeling of faces is important in this area since people will most likely be dressed nicely and their facial modeling should reflect this. Important: Light distribution on surfaces should be even, there should be no glare and there should be no distracting shadows.
20
LIGHTING – Community Room DESIGN GOALS: Metaphorically, the community room is like the gem of the recreation center. It is the most formal of all of the spaces and I wanted to reflect that in my design. This area is used for banquets, luncheons and dinners most often, so I wanted to design it as a dining area with adequate light for note-taking, since there is a speaker every now and then. I wanted the room to look like a theatre-type setting with a simple elegance to it for fine dining. I wanted to keep it as uncluttered as possible.
21
LIGHTING – Community Room EQUIPMENT USED: Pendant Mounted Semi-direct Fixtures Decorative wall sconces on pillars around the room Fluorescent strips in all four coves Compact fluorescent downlights within and between the coves
22
LIGHTING – Community Room Semi-direct Pendant: 4-24W CFL lamps Suspended 6’ EQUIPMENT LOCATIONS:
23
LIGHTING – Community Room EQUIPMENT LOCATIONS: Fluorescent Staggered Strips: 1-32W T8 for 4’ Fixtures 1-25W T8 for 3’ fixtures
24
LIGHTING – Community Room EQUIPMENT LOCATIONS: 6” Compact Fluorescent Downlight: 2-26W CFL lamps
25
LIGHTING – Community Room EQUIPMENT LOCATIONS: Wall Sconce: 1-26W CFL lamp
26
LIGHTING – Community Room ILLUMINANCE RESULTS: TABLE COVEFLOOR
27
LIGHTING – Community Room RENDERINGS:
28
LIGHTING – Community Room CONCLUSIONS: The power density for a cafeteria is 1.8 W/ ft2 and the power density for family dining is 1.9 W/ ft2, so 1.4 W/ ft2 falls below both of these and is therefore okay. Pendants and wall sconces add an air of elegance, while still maintaining a non-cluttered look The cove is does not look ‘washed out’ since only one- lamp strip fixtures are used
29
Power Factor Correction Analysis PROCESS: Many utilities charge a penalty for low power factors. The power factor is the ratio of working to total power – the reactive component performs no useful work. * Analyzed the financial impact of improving the power factor to 90% by adding capacitors * Based off of12 months worth of utility bills supplied by the city’s engineer
30
Power Factor Correction Analysis PROCESS: Calculated the PF for all 12 months using the formula: PF = cos [tan -1 (rKVA Demand/Measured KVA load)] Checked the reactive billing demand: Reactive billing demand = KW*(kVAR Hours/ kW Hours) – 30 3)Calculated the kVAR cost per month based on a Medium General Service Schedule: REACTIVE DEMAND CHARGE = $0.48 per rKVA Actual cost per month = Reactive billing demand*($0.48 / hour)
31
Power Factor Correction Analysis PROCESS: 4) With the existing and desired power factors use the capacitor correction table to find a multiplier 5) Multiply the building’s electrical kW load by this number to get the KVAR of capacitors required RESULTS: Total KVAR cost for 2002: $1691.15 100 KVAR of capacitors needed to correct PF Cost of 100 KVAR capacitor = $828 (comSprague) Total savings for one year = $863.15 *Almost an immediate payback!!
32
SPECIAL THANKS Van Dijk, Westlake, Reed, Leskosky – Cleveland, OH Dr. Mistrick and Dr. Moeck Professor Ken Davidson – PSU Facilities Engineering Michael Rump – Westlake Recreation Department Bob Kelly – Engineer for the City of Westlake John Durkee – Bacik, Karpinski, & Associates Rajeev Chokshi – VWRL Architects and Engineers Phil LiBassi, Principal – VWRL Architects and Engineers
33
COMMENTS / QUESTIONS Thank you for your attention!
34
Exterior Controls I selected an outdoor controller to control the exterior lighting loads (Poles, Inground fixtures, bollards). The Outdoor Controller uses the exterior photocell sensor to read light levels and transmit the data to the controller module. The photocell will be mounted on the porch roof, which faces the northern sky.
35
Comm. Room Controls