Download presentation
Presentation is loading. Please wait.
Published byPamela Hoover Modified over 8 years ago
1
NERC Field Trial ERCOT Time Error Correction
2
Balancing Authority Control Standards Drafting Team (BACSDT) Pursuing the option to eliminate Time Error Correction (TEC) as a reliability standard defined in BAL - 004 Completed Industry Survey TEC paper covering the history and reasons to remove/keep TEC went out with the Survey Initiating Field Trial to reduce TEC offset from 20 to 10mHz (Eastern Interconnect) Initiating Field Trial to NOT perform Time Error Correction (ERCOT)
3
Balance Authority Control SDT Tasks Address the following: FERC Order 693” applies to NERC standards BAL-002, 004, 005, and 006 Time Error Correction special Area Control Error cases Inadvertent Interchange reliability requirements/business practices with NERC and NAESB collaborative participation
4
Field Trial in ERCOT Have: 1.Written verification from NERC that ERCOT ISO will not be in violation of NERC standards Need: 1.Need Stakeholder support of OGR to modify TEC requirement 2.Written verification from TRE that ERCOT will not be in violation of the Protocols and OG’s
5
OGRR219 Section 1.5, Time Error Monitoring Modify the last sentence by removing the following text: ‘however, at no time should the accumulated time error be allowed to exceed five (5) seconds.’
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.