1
PV Monastiraki 150kW Presentation September 2010
2
Main data of the project Installed Capacity: 150 kW Location: Northern Greece, Evros Prefecture, Feres Municipality, near Monastiraki village Land ownership: Lease Agreement with the Prefecture of Evros Construction Cost (including connection costs): around 1 million Euros In function from September 2009
3
Further development Application to PPC for expansion of the existing project with 300kW In the plot of the project is also installed a wind measurement mast from CRES since 8 months. The 6 months report shows 6,3m/sec in 10m height. It is planned an installation of one 50kW wind turbine (waiting for PPC start accepting applications) and one 3MW Enercon E101wind turbine.
4
Location
5
Technical Data Constructor : KLT Energy 681 PV Panels BP Solar 3220 N 9 Inverters SMA SMC 11000 TL ESS GR 216m K2 Mounting System Control System SMA Web – Box Alarm System FBI OMNI 400
6
Annual Production September 2009 > 30.480 kWh October 2009 > 17.840 kWh November 2009 > 12.320 kWh December 2009 > 5.840 kWh January 2010 > 8.640 kWh February 2010 > 12.080 kWh March 2010 > 18.926 kWh April 2010 > 21.983 kWh May 2010 > 26.054 kWh June 2010 > 21.778 kWh July 2010 > 23.760 kWh August 2010 > 24.227 kWh
7
Annual Income (Feed-In Tariff 0,4 €/kWh) September 2009 > 13.289,28 € October 2009 > 7.778,24 € November 2009 > 5.371,52 € December 2009 > 2.546,24 € January 2010 > 3.767,04 € February 2010 > 5.266,88 € March 2010 > 8.327,44 € April 2010 > 9.672,52 € May 2010 > 11.463,76 € June 2010 > 9.582,32 € July 2010 > 10.549,44 € August 2010 > 10.756,79 €
8