Download presentation
Presentation is loading. Please wait.
Published byChristopher Steven Horton Modified over 9 years ago
1
3-5/10/2005, LjubljanaEWGLAM/SRNWP meeting NWP related activities @ Slovak Hydrometeorological Institute 2005
2
3-5/10/2005, LjubljanaEWGLAM/SRNWP meeting ALADIN @ SHMI (1) 2882x2594 km domain size 320x288 points in quadratic grid [2.19 ; 33.99 SW] [39.06 ; 55.63 NE] 9.0 km horizontal resolution 37 vertical levels 400s time step 54h forecast length 4x/day 00/06/12/18 UTC coupled to ARPEGE 3h coupling frequency dynamic adaptation mode AL28T3_czphys HPC: IBM @server pSeries 690 Type 7040 Model 681 32 CPUs POWER 4+ 1.7 GHz 32 GB RAM Memory IBM FAST T600 Storage Server EXP700 1.5TB AIX 5.2 NEW ARCHIVE: HW: IBM Total Storage 3584 Tape Library (24 TB) SW: IBM Tivoli Storage Manager one.shmu.sk
3
3-5/10/2005, LjubljanaEWGLAM/SRNWP meeting ALADIN @ SHMI (2) OPERATIONAL and R&D highlights 01/07/2004: full operational status 01/01/2005: 24/7 human monitoring 12/01/2005: switch to +54h integration 31/03/2005: AL28T3_czphys operational 25/07/2005: 06UTC run introduced 21/09/2005: wind dynamical adaptation operational 29/09/2005: 18UTC run introduced Feasibility study of MOS technique Case study of 19/11/2004 severe windstorm 6-10/06/2005 15 th ALADIN workshop (Bratislava)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.