Download presentation
Presentation is loading. Please wait.
Published byBernard Simmons Modified over 9 years ago
1
AS9104-3 Report July 20, 2011 Boston, MA
2
Team Members Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division Shanya Salamaca Rick Downs, Cessna-Textron Vince May, Honeywell Ian Folland Tony Marino, Boeing Ian Dummigan Dominique Thiault Lisa Greenleaf Jeffery Long, UTC (Pratt & Whitney) Reg Blake, IAAR Shuji Komori Giuseppe Leoni Kimberly Maggie
3
Auditor Authentication Process
4
AA Authentication 4 audits comprising 20 on-site auditor days QMS/AQMS audits 2 audits may exclude design (7.3) QMS Lead Auditor course AQMS Foundation Course Audit Competency Demonstration AEA Authentication 4 audits comprising 20 on-site auditor days QMS/AQMS audits 2 audits may exclude design (7.3) QMS Lead Auditor course AQMS Foundation Course within 3 yrs 2/10 years ASD experience minimum Technical Competence evaluated by CB/AAB approved by SMS Auditor Competency Demonstration
5
AA AEA Expansion 300 on-site audit days of an AQMS in 5 yr or 500 on-site audit days of an AQMS in 10 yr Technical Competence evaluated by CB/AAB approved by SMS Auditor Competency evaluation Re-authentication in 5 yrs Re-authentication Every 5 yrs Same criteria is initial authentication Attendance at one SMS auditor workshop during re-authentication period Decision made by AAB Suspension / Withdrawal Not fulfilling AS9104-1/3 reqmts AQMS authentication contains false info Falsified audit findings Actions that would bring ICOP into dispute Not informing AAB of a previous rejection, suspension, or withdrawal from another AAB Decision for suspension, AAB will determine conditions of suspension
6
Training Provider Requirements TPAB Requirements Record retention requirements Training Courses requirements Requirements for training instructors AAB requirements Guidance on assessment Principles and Practices Additional Requirements contained within AS9104/3 Draft
7
Convene team 2 -3 times prior to next IAQG meeting address open issues clarify /include relevant feedback Complete handoff to new Team leader Detailed presentation to AAQG/RMC in Long Beach (Sep) General feedback from Sectors after IAQG meeting Next Steps
8
Questions and Thoughts
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.