Presentation is loading. Please wait.

Presentation is loading. Please wait.

AS9104-3 Report July 20, 2011 Boston, MA. Team Members  Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division  Shanya Salamaca  Rick Downs,

Similar presentations


Presentation on theme: "AS9104-3 Report July 20, 2011 Boston, MA. Team Members  Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division  Shanya Salamaca  Rick Downs,"— Presentation transcript:

1 AS9104-3 Report July 20, 2011 Boston, MA

2 Team Members  Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division  Shanya Salamaca  Rick Downs, Cessna-Textron  Vince May, Honeywell  Ian Folland  Tony Marino, Boeing  Ian Dummigan  Dominique Thiault  Lisa Greenleaf  Jeffery Long, UTC (Pratt & Whitney)  Reg Blake, IAAR   Shuji Komori   Giuseppe Leoni   Kimberly Maggie

3 Auditor Authentication Process

4 AA Authentication 4 audits comprising 20 on-site auditor days QMS/AQMS audits 2 audits may exclude design (7.3) QMS Lead Auditor course AQMS Foundation Course Audit Competency Demonstration AEA Authentication 4 audits comprising 20 on-site auditor days QMS/AQMS audits 2 audits may exclude design (7.3) QMS Lead Auditor course AQMS Foundation Course within 3 yrs 2/10 years ASD experience minimum Technical Competence evaluated by CB/AAB approved by SMS Auditor Competency Demonstration

5 AA AEA Expansion 300 on-site audit days of an AQMS in 5 yr or 500 on-site audit days of an AQMS in 10 yr Technical Competence evaluated by CB/AAB approved by SMS Auditor Competency evaluation Re-authentication in 5 yrs Re-authentication Every 5 yrs Same criteria is initial authentication Attendance at one SMS auditor workshop during re-authentication period Decision made by AAB Suspension / Withdrawal Not fulfilling AS9104-1/3 reqmts AQMS authentication contains false info Falsified audit findings Actions that would bring ICOP into dispute Not informing AAB of a previous rejection, suspension, or withdrawal from another AAB Decision for suspension, AAB will determine conditions of suspension

6 Training Provider Requirements TPAB Requirements Record retention requirements Training Courses requirements Requirements for training instructors AAB requirements Guidance on assessment Principles and Practices Additional Requirements contained within AS9104/3 Draft

7 Convene team 2 -3 times prior to next IAQG meeting address open issues clarify /include relevant feedback Complete handoff to new Team leader Detailed presentation to AAQG/RMC in Long Beach (Sep) General feedback from Sectors after IAQG meeting Next Steps

8 Questions and Thoughts


Download ppt "AS9104-3 Report July 20, 2011 Boston, MA. Team Members  Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division  Shanya Salamaca  Rick Downs,"

Similar presentations


Ads by Google