2009 Contract Changes John Mootz APFO 2008 NAIP Post-Mortem Meeting November 19, 2008.

Similar presentations


Presentation on theme: "2009 Contract Changes John Mootz APFO 2008 NAIP Post-Mortem Meeting November 19, 2008."— Presentation transcript:

1 2009 Contract Changes John Mootz APFO 2008 NAIP Post-Mortem Meeting November 19, 2008

2 11/19/20082008 NAIP Post-Mortem Meeting2 Contract Changes  Release copyright at 90% payment Allows easier distribution in disaster  Change “histogram peak” to median (or mean) for midtone brightness (Atch A, para 3.2(c))  Sample imagery GFP paragraph will be deleted (para B-3.2) Paragraph became obsolete with the pre-production sample requirement

3 11/19/20082008 NAIP Post-Mortem Meeting3 Potential Changes  Require projection information in CCM header  Require prime contractor to maintain copy of direct-digital capture data until ortho acceptance What level of data? Should it be a contractual requirement?

4 11/19/20082008 NAIP Post-Mortem Meeting4 Changes to Flight Planning  Include “closer” coverage in restricted airspace Non-acquisition will not impact past performance score APG and Nellis AFB only known areas

5 11/19/20082008 NAIP Post-Mortem Meeting5 Aberdeen Proving Ground, MD Originally planned Added Not planned

6 11/19/20082008 NAIP Post-Mortem Meeting6 2009 RFP Schedule RFP release18 Feb Proposal Due20 Mar TO awards10 Apr


Download ppt "2009 Contract Changes John Mootz APFO 2008 NAIP Post-Mortem Meeting November 19, 2008."