Download presentation
Presentation is loading. Please wait.
Published byMelanie Boyd Modified over 8 years ago
1
Overview of Discussion What are the pros and cons of the options? Are there other options? A2 SUBCOMMITTEE
2
Overview of Options 1. +/- 6% msmt. accuracy by volume or flow rate (consistent with CVP contractors’ requirement) at individual customer 2. +/- 15% msmt. accuracy by volume or flow rate at individual customer 3. Combination of measurement at laterals, and/or at individual customers 4. Measurement at basin level or supplier level, with estimation for individual customers 5. Others? A2 SUBCOMMITTEE
3
Option 1: +/- 6% msmt. accuracy by volume or flow rate Can this meet requirements of section 10608.48(b) Annual report of aggregated farm-gate delivery Implement pricing structure at least in part volumetric What are pros/cons of this option, such as: Kinds of devices that can provide this accuracy Appropriate maintenance, checks, calibration Typical range of installation cost Other considerations A2 SUBCOMMITTEE
4
Option 2: +/- 15% msmt. accuracy by volume or flow rate Can this meet requirements of section 10608.48(b) Annual report of aggregated farm-gate delivery Implement pricing structure at least in part volumetric What are pros/cons of this option, such as: Kinds of devices that can provide this accuracy Appropriate maintenance, checks, calibration Typical range of installation cost Other considerations A2 SUBCOMMITTEE
5
Option 3: Lateral-level Measurement Can this meet requirements of section 10608.48(b) Annual report of aggregated farm-gate delivery Implement pricing structure at least in part volumetric What are pros/cons of this option, such as: Kinds of devices that can provide this accuracy Appropriate maintenance, checks, calibration Typical range of installation cost Other considerations A2 SUBCOMMITTEE
6
Option 4: Supplier-level Measurement Can this meet requirements of section 10608.48(b) Annual report of aggregated farm-gate delivery Implement pricing structure at least in part volumetric What are pros/cons of this option, such as: Kinds of devices that can provide this accuracy Appropriate maintenance, checks, calibration Typical range of installation cost Other considerations A2 SUBCOMMITTEE
7
Option X: Other Option? Can this meet requirements of section 10608.48(b) Annual report of aggregated farm-gate delivery Implement pricing structure at least in part volumetric What are pros/cons of this option, such as: Kinds of devices that can provide this accuracy Appropriate maintenance, checks, calibration Typical range of installation cost Other considerations A2 SUBCOMMITTEE
8
Revisiting Questions to Consider What are the details to define a standard? Is defining an accuracy standard as a +/- percentage appropriate? Should the definition include additional details (e.g. operating flow range, field conditions, etc.)? Should open-channel and piped delivery systems have different accuracy standards? How should the “irrigation season” be defined for an agricultural water supplier? A2 SUBCOMMITTEE
9
Compliance, Applicability, and Exceptions How does a supplier comply? Initial compliance of installed devices On-going compliance – sampling program or all devices during defined period of years o Compliance = every device compliant? o Compliance = xx% of devices compliant? o Demonstrate plan to fix non-compliant devices? Reporting of devices’ accuracy Must every delivery point be measured regardless of size? What is a reasonable program for maintenance, checks, and calibration of measurement devices? Other exceptions (e.g., parcel size)?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.